<console@squeak.haus> - home - stories -

########
Exterior
########

Office park. Trees, parking lot, guard gate with helpful guard. 1-2 storey buildings around the periphery. White stone with shiny black bands around the top and bottom. Doorways and windows outlined in black.

At the center, a towering building, 15-20 storeys at least, all black glass. Large entryway at the center of the base, with a short staircase leading up. White company logo centered above the doorway, lit at night.

########
Interior
########

F1: Reception - A large, clean room. Polished white tile floors. Light streaming in from the glass wall skirting the entryway, causing the glittery parts of the stone floor to glisten and gleam. Ahead, a large black slab of a desk, monolithic in the minimalist space. LED lights illuminate the walls and most of the interior with a dim, yet sufficient glow.

F1: Arrivals - Even more sparsely furnished than the Reception Area, somehow. Only two doorways, one behind and one before, and a terminal attached to the wall. An Arrival Assistant enters through the door opposite the entrance, enters the Candidate's information, then exits, with Candidate in tow, further into the Facility.

F1: Processing - Candidates are helped into their BaseLayer™ suits before a questionaire determining exterior shell appearance and interior configuration.